  • 【UPDATE September 3rd, 2020】Trail Closure and Detours due to Construction in Kesennuma City (Map: North Kesennuma Section, February 14 2019)
2020.09.03 気仙沼市 Kesennuma    

【UPDATE September 3rd, 2020】Trail Closure and Detours due to Construction in Kesennuma City (Map: North Kesennuma Section, February 14 2019)

This page has been updated with changes made to the detour and construction developments (as of September 3rd, 2020).
• ② has been cleared.
• The collapsed areas in ③ that were shown as closed are now fully repaired and walkable, but there is upcoming construction to build a new walking path. The construction schedule—what is closed when— is a fluid and ongoing development, so check the signage and instructions from people on-site and detour around spots as necessary.
• Changes have been made to the detour for ⑤.

**********************************************
Some closures due to construction on the Kesennuma section have been extended.
There are some smaller detours set up along the way as well, so please follow the signage and instructions from construction workers.

1. Location:
North Kesennuma Section (see the Detour Map)

2. Period of Closure:
For the time being (except closure ② has been cleared)

3. Inquiries:
(About the trail)
For all closures shown, Ministry of the Environment, Ofunato Ranger Office (0192-29-2759)
For area ①, Karakuwa Tourism Association (0226-32-3029)
(About construction)
For area ①, Kesennuma Industry Department, Fisheries Infrastructure Division, Infrastructure (0226-22-3414)
For area ③: Kesennuma Industry Dept. Tourism Section (0226-34-3438)
For areas ④ and ⑤ : Ministry of the Environment, Ofunato Ranger Office (0192-29-2759)